#
#

Construction Project Scheduling and Control (Record no. 399)

MARC details
000 -LEADER
fixed length control field 01733nam a2200241Ia 4500
001 - CONTROL NUMBER
control field 0001326
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190302112255.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 170602s9999 xx 000 0 und d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9788126533152
028 ## - PUBLISHER NUMBER
Qualifying information 2016
Source Allied Informatics, Jaipur
040 ## - CATALOGING SOURCE
Language of cataloging English
Original cataloging agency BSDU
Transcribing agency BSDU
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 690.068 5
Item number MUB
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mubarak, Saleh
245 #0 - TITLE STATEMENT
Title Construction Project Scheduling and Control
250 ## - EDITION STATEMENT
Edition statement 2nd
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. Wiley India Pvt. Ltd. India
Place of publication, distribution, etc. New Delhi
Date of publication, distribution, etc. 2015,c2010
300 ## - PHYSICAL DESCRIPTION
Extent 456
500 ## - GENERAL NOTE
General note Written by a career construction professional, this text about scheduling and project control addresses the average student, detailing all the steps clearly and without shortcuts. Solved and unsolved exercises cover all subjects, computer software programs for construction are included for each chapter, presents precedence networks as the realistic solution to scheduling, the main part of project control, and introduces new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Contents:<br/>· Introduction.<br/><br/>· Bar (Gantt) Charts.<br/><br/>· Basic Networks.<br/><br/>· The Critical Path Method (CPM).<br/><br/>· Precedence Networks.<br/><br/>· Resource Allocation and Resource Leveling.<br/><br/>· Schedule Updating and Project Control.<br/><br/>· Schedule Compression and Time-Cost Trade-Off.<br/><br/>· Reports and Presentations.<br/><br/>· Scheduling as Part of the Project Management Effort.<br/><br/>· Other Scheduling Methods.<br/><br/>· Dynamic Minimum Lag Relationship.<br/><br/>· Construction Delay and Other Claims.<br/><br/>Appendix A Computer Project.<br/><br/>Appendix B Sample Reports.<br/><br/>Abbreviations.<br/><br/>Glossary.<br/><br/>References.<br/><br/>Bibliography.<br/><br/>Index.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Civil
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Books
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Cost, replacement price Price effective from Koha item type Collection code
    Dewey Decimal Classification     BSDU Knowledge Resource Center, Jaipur BSDU Knowledge Resource Center, Jaipur 12/03/2016 819.00   690.068 5 MUB 001326 02/12/2020 819.00 06/02/2017 Books  
    Dewey Decimal Classification     BSDU Knowledge Resource Center, Jaipur BSDU Knowledge Resource Center, Jaipur 12/03/2016 819.00   690.068 5 MUB 001327 02/12/2020 819.00 06/02/2017 Books  
    Dewey Decimal Classification   Not For Loan BSDU Knowledge Resource Center, Jaipur BSDU Knowledge Resource Center, Jaipur 12/03/2016 819.00   690.068 5 MUB 001328 02/12/2020 819.00 06/02/2017 Books Not for Loan