000 nam a22 7a 4500
999 _c1265
_d1265
003 OSt
005 20180214143353.0
008 180214b xxu||||| |||| 00| 0 eng d
020 _a978-81-219-1773-5
028 _bAllied Informatics, Jaipur
_c4485/23/01/2018
_d4485/23/01/2018
_q2017-18
040 _aBSDU
_bEnglish
_cBSDU
082 _a658.5
_bTEL
100 _aTelsang, Martand
245 _aIndustrial Engineering and Production Management
260 _aNew Delhi
_bS. Chand & Company Pvt. Ltd.
_c2017,c1998
300 _a687
_c6.75''X9.5''
504 _aPart I : Industrial Engineering Introduction To Industrial Engineering Productivity Work-Study Method Study Work Measurement Value Engineering Plant Location Plant Layout Material Handing Job Evaluation And Merit Rating Wages And Incentives Ergonomics Part Ii: Production Management Production System New Product Design Demand Forecasting Production Planning And Control Capacity Planning Material Requirement Planning (Mrp) Process Planning Process Planning Project Scheduling With Cpm And Pert Production Control L Inventory Control Production Cost Concepts And Break-Even Analysis Maintenance Management Make Or Buy Decisions Planning And Control Of Batch Production Application Of Linear Programming Technique In Production Management Management Information System Business Process Engineering Group Technology Just In Time (Jit) Manufacturing Operations Strategy Materials Management Project Management Service Management Product And Service Reliability Theory Of Constraints (Toc) Advanced Manufacturing Technologies And Systems Supplements Additional Solved Problems Appendices
650 _aManagement
650 _aMechanical Engineering
650 _aManufacturing Engineering
942 _2ddc
_cBK